Scaled
drawings are produced showing the size and positions
of the vehicles and hospitality area, in conjunction
with the venue service ducts, which allow the electrical
supply, water and waste connection to be brought
up in the correct place.
The
carpet is laid and a protective polythene cover
put over the top. The build of the stand commences.
One
of the main features to the stand is a 20m x 4m
high wall, which has an oval aperture cut out to
link the Seddon Atkinson and hospitality areas.
The first part of the framework is laid out and
fitted together.