Scaled drawings are produced showing the size and positions of the vehicles and hospitality area, in conjunction with the venue service ducts, which allow the electrical supply, water and waste connection to be brought up in the correct place.
 

The carpet is laid and a protective polythene cover put over the top. The build of the stand commences.

 
One of the main features to the stand is a 20m x 4m high wall, which has an oval aperture cut out to link the Seddon Atkinson and hospitality areas. The first part of the framework is laid out and fitted together.